News

Home / News / News Details


APPS Cargo operation in BC are being affected by severe weather. Lates updates from DriveBC

Western Canada is being hit by some pretty hard weather right now, here are a couple of snap shots from the DriveBC website. We will be updating here on the APPS website and via our social media pages Twitter @AppsTransGroup @AppsCargo Facebook Apps Transport Group and Instagram apps_cargo apps_transport

 

Highway 1. High avalanche hazard between Bowolin Rd and Griffin Lake Avalanche Gate for 14.6 km (26 km east of Sicamous to 24 km west of Revelstoke). The road is closed. Watch for traffic control. Next update time Wed Jan 8 at 4:00 PM PST. Last updated Wed Jan 8 at 6:52 AM PST. (DBC-14639)

 

Highway 1, in both directions. High avalanche hazard between Townley St and 14th St N for 142.5 km (Revelstoke to Golden). Road closed. Detour not available. Next update time Wed Jan 8 at 4:00 PM PST. Last updated Wed Jan 8 at 6:59 AM PST. (DBC-14630) [

 

Highway 1, in both directions. Avalanche control work between Glacier National Park West Boundary and Glacier National Park East Boundary for 43.5 km (1 km east of West Boundary of Glacier National Park to East Boundary of Glacier National Park). Until Wed Jan 8 at 8:00 AM PST. Road closed. Detour not available. Please refer to Drive BC ID 14630. Next update time Wed Jan 8 at 4:00 PM PST. Last updated Wed Jan 8 at 6:58 AM PST. (DBC-14625)

 

Highway 3. High avalanche hazard between West Avalanche Gate and East Avalanche Gate for 18.0 km (Kootenay Pass). Road closed. Alternate route available from Nelson to Creston. Hwy 3A Kootenay Lake ferry estimated travel time 2.5 hours. Estimated time of re-opening Wed Jan 8 at 6:00 PM PST. Next update time Wed Jan 8 at 12:00 PM PST. Last updated Tue Jan 7 at 11:59 AM PST. (DBC-14601)

 

Highway 5, in both directions. Avalanche control work planned between Exit 202 and Exit 228: Coquihalla Lakes Rd for 26.6 km (11 km south of Great Bear Snowshed to 9 km north of Coquihalla Summit). Starting Wed Jan 8 at 11:00 AM PST until Wed Jan 8 at 3:00 PM PST. THE ROAD WILL BE CLOSED BETWEEN HOPE AND MERRITT. Changes could occur based on weather conditions. Please prepare to use alternate routes. Next update time Wed Jan 8 at 3:00 PM PST. Last updated Mon Jan 6 at 4:50 PM PST. (DBC-14588)


Back to News

More News
Biden signs executive order to strengthen COVID supply chains
Plan now for a healthy economic rebound
Next News >>
Career Opportunities Join Our Team

Affiliations

APPS is an active member of the business community with memberships and affiliations with many industry, business and governmental bodies including: